Gas network

We ensure a reliable supply – from Lower Saxony to Lake Constance.
 

Telecommunications network

Our fibre optics network provides a telecommunications infrastructure with strong broadband performance.

Hydrogen network

We are securing the connection to the European and national hydrogen infrastructure.

About us

Learn more about our company.
 

Responsibility

What we do to ensure the protection of people and nature.

Hydrogen initiative for BW

We network players from politics, industry and society.

Open positions

Become part of our team – here you will find our open positions!
 

Working at terranets bw

How we work, what we offer and how you can make a difference.
 

Career Guidance and Getting Started

More information about our programs for internships, apprenticeships, and degree programs

Newsroom

Here you will find current information and press releases.

Current press releases

Press releases

Market information

Network development projects

We provide transparent information on our expansion measures

Current gas supply situation

As an operator of critical infrastructure, we provide information on the supply situation.

Media centre

We share photos for editorial use.

Everything for our connection customers

Here you will find information on the gas and biogas network connections.

Gas network connection

Learn how a network connection or a network coupling can be  implemented at terranets bw.

To the overview

Biogas network connection

Check whether your biogas plant can be connected to the terranets bw transmission system.

To the overview

Gas network connection

Learn how a network connection or a network coupling can be implemented at terranets bw.

Would you like to implement a network connection or a network coupling to directly connect to the high-pressure gas pipeline of terranets bw?

Here we show you step by step how it works.

For information on connecting a biogas plant, please see below:

Network connection for biogas plant

Step by step instructions

  • 1. Please contact us

    1. Please contact us

    To get initial information regarding a network connection to the transmission system of terranets bw, please write an email to netzanschluss[at]terranets-bw.de.

  • 2. Make a binding network connection enquiry

    2. Make a binding network connection enquiry

    To send a binding enquiry to terranets bw in order to run the tests required for a gas connection commitment, please complete and send the form below to: netzanschluss[at]terranets-bw.de

    Grid connection request form

     

  • 3. Reply from terranets bw: cost estimation for the processing

    3. Reply from terranets bw: cost estimation for the processing

    Upon receipt of your network connection enquiry, we at terranets bw inform you without delay of the costs related to handling your enquiry. We also inform you about which further documents are needed for the tests.

  • 4. Network connection test for gas by terranets bw

    4. Network connection test for gas by terranets bw

    Upon receipt of the complete documents, the tests required for a connection commitment are carried out (e. g. capacity simulation, capacity calculation and evaluation, rough routing, connection options). This results in a test report including a cost estimation for implementing the network connection.

  • 5. Your decision for a network connection

    5. Your decision for a network connection

    If you decide in favour of implementing the network connection, we draft the contractual basis prior to beginning the planning and construction of the network connection.

  • 6. Conclusion of a network connection contract

    6. Conclusion of a network connection contract

    These contracts regulate the essential technical and legal conditions for the gas delivery/offtake, thus providing a sound base for cooperation.

    Netzanschlussvertrag 
    Netzkopplungsvertrag
    Richtlinien terranets bw 
    Anlage 1
    Anlage 2

  • 7. Implemetation of network connection – planning and construction

    7. Implemetation of network connection – planning and construction

    After concluding the network connection contract or network coupling contract, we immediately initiate the necessary measures for implementing the network connection.

Biogas plant network connection

Learn how a biogas network connection to the terranets bw transmission system can be implemented.

Sie planen eine Biogasanlage mit Aufbereitung und Einspeisung in ein Erdgasnetz und wollen prüfen, ob diese Anlage an das Fernleitungsnetz der terranets bw angeschlossen werden kann?

Bitte beachten Sie dabei die technischen Mindestanforderungen für die Einspeisung von Biogas bevor Sie einen verbindlichen Antrag zur Prüfung eines Netzanschlussbegehrens an uns stellen.

Step-by-step instructions

  • 1. Please contact us

    1. Please contact us

    To get initial information regarding a network connection to the transmission system of terranets bw, please write an email to netzanschluss[at]terranets-bw.de.

  • 2. Make a binding biogas network connection enquiry

    2. Make a binding biogas network connection enquiry

    To send a binding enquiry to terranets bw in order to run the tests required for a biogas connection commitment, please complete and send the form below to: netzanschluss[at]terranets-bw.de

    Biogas Netzanschlussbegehren (PDF)
    Minimum technical requirement for feeding in biogas

  • 3. Reply by terranets bw: cost estimation for the processing

    3. Reply by terranets bw: cost estimation for the processing

    Upon receipt of your network connection enquiry, we at terranets bw inform you without delay of the costs related to handling your enquiry. We also inform you about which further documents are needed for the tests.

  • 4. Biogas network connection test by terranets bw

    4. Biogas network connection test by terranets bw

    Upon receipt of the complete documents, the tests required for a biogas connection commitment are carried out (e. g. capacity simulation, capacity calculation and evaluation, rough routing, connection options). This results in a test report including a cost estimation for implementing the biogas network connection.

  • 5. Your decision for a biogas network connection

    5. Your decision for a biogas network connection

    If you decide in favour of implementing the biogas network connection, we draft the contractual basis prior to beginning the planning and construction of the network connection.

  • 6. Conclusion of a biogas network connection contract

    6. Conclusion of a biogas network connection contract

    These contracts regulate the essential technical and legal conditions for the gas delivery/offtake, thus providing a sound base for cooperation.

    To conclude a biogas network connection contract, please contact: netzanschluss[at]terranets-bw.de

  • 7. Implementation of a biogas network connection

    7. Implementation of a biogas network connection

    After concluding the biogas network connection contract, we will immediately initiate the necessary measures for implementing the network connection.

Please contact us

We are happy to help you.

Contact for Network Connection

Astrid Thome

netzanschluss[at]terranets-bw.de
+49 172 7496 353

Contact for Network Connection

Margit Christians

netzanschluss[at]terranets-bw.de
+49 172 7435 335

Cookie-Einstellungen