The terranets bw gas network With a length of approximately 3,000 kilometers, the terranets bw gas transmission network is a central component of the energy infrastructure in southwestern Germany. It is connected to national and international partner networks via numerous feed-in and interconnection points and reliably supplies distribution network operators and industrial customers with natural gas. Four underground gas storage facilities further ensure supply and system stability—one of which is uniquely and fully integrated into our transmission network.
You can find capacity data for internal orders placed by the immediately downstream network operators for previous years below.
Kapazitätsangaben zu den internen Bestellungen 2020 - PDF
Kapazitätsangaben zu den internen Bestellungen 2020 - XLS
Kapazitätsangaben zu den internen Bestellungen 2019 - PDF
Kapazitätsangaben zu den internen Bestellungen 2019 - XLS
Kapazitätsangaben zu den internen Bestellungen 2018 - PDF
Kapazitätsangaben zu den internen Bestellungen 2018 - XLS
Kapazitätsangaben zu den internen Bestellungen 2017 - PDF
Kapazitätsangaben zu den internen Bestellungen 2017 - XLS
Kapazitätsangaben zu den internen Bestellungen 2016 - PDF
Kapazitätsangaben zu den internen Bestellungen 2016 - XLS
Kapazitätsangaben zu den internen Bestellungen 2015 - PDF
Kapazitätsangaben zu den internen Bestellungen 2015 - XLS
These contracts regulate the essential technical and legal conditions for the gas delivery/offtake, thus providing a sound base for cooperation.
Netzanschlussvertrag
Netzkopplungsvertrag
Richtlinien terranets bw
TMA-Mess
Planungshinweise inklusive Anlagen
Hier finden Sie alle relevanten Dokumente:
terranets bw: Marktinformationen > Transparenzdaten
Hier finden Sie alle relevanten Informationen für den Netzzugang. Der Zugang zum Leitungsnetz erfolgt auf Basis der aktuell gültigen Kooperationsvereinbarung und unseren Geschäftsbedingungen. Hier finden Sie eine detaillierte Beschreibung des Zugangs zum Leitungsnetz der terranets bw.
Unsere Ansprechpartner im Netzzugang:
No downloads available
MaLo-ID
Kontaktdatenblatt terranets bw
Geschäftsprozesse GeLiGas
Geschäftsbedingungen
Keine Downloads verfügbar
Annual Monitoring Report in accordance with KAP+
Jährlicher Monitoring-Bericht nach KAP+
Prozessbeschreibung MBI und Kapazitätsrückkauf
Utility network maps
Leitungsnetzkarte terranets bw (Baden-Württemberg, Bayern)
Leitungsnetzkarte terranets bw (Netzgebiet Nord, Hessen)
Grid interconnection points: feed-in and feed-out
Netzkopplungspunkte Einspeisung
Netzkopplungspunkte Ausspeisung
bFZK Temperature conditions
Key points
Network Structure Data
Technical Capacity
Historical technical capacity over the past five years:
Technische Kapazität 2020
Technische Kapazität 2021
Technische Kapazität 2022
Technische Kapazität 2023
Technische Kapazität 2024
Nominations and renominations
For more information, please visit the ENTSOG Tranparency Plattform.
Maintenance measures affecting capacity
Wir halten unsere Netze immer auf dem aktuellsten Stand der Technik. Informieren Sie sich über aktuelle Wartungs-, Instandhaltungs- und Einbindungsmaßnahmen im Netzgebiet der terranets bw, die Kapazitätseinschränkungen zur Folge haben können. Davon betroffene Transportkunden oder Netzbetreiber werden rechtzeitig über mögliche Einschränkungen ihrer Transportkapazität informiert.
Kapazitätsrelevante Instandhaltungsmaßnahmen
Interruptions
Im Zeitraum 2006 bis 2011 sowie 2013, 2014, 2019 und 2020 war der Transport im Gasnetz der terranets bw uneingeschränkt möglich. Trotz regionaler Kapazitätseinschränkungen konnte durch den Einsatz interner Schalt- und Ersatzmaßnahmen die Unterbrechung der unterbrechbaren Kapazitäten vermieden werden.
Nachstehend finden Sie Informationen zu Unterbrechungen an maßgeblichen Ein- und Ausspeisepunkten im Netzgebiet der terranets bw aufgrund Kapazitätsengpässen nach § 16 EnWG.
Informationen zu Unterbrechungen an maßgeblichen Ein- und Ausspeisepunkten im Netzgebiet der terranets bw aufgrund von Überbuchungen finden Sie unter nachfolgendem Link.
Informationen zu Unterbrechungen an maßgeblichen Ein- und Ausspeisepunkten im Netzgebiet der terranets bw aufgrund geplanter Instandhaltungsmaßnahmen finden Sie unter nachfolgendem Link.
Informationen zu Unterbrechungen an maßgeblichen Ein- und Ausspeisepunkten im Netzgebiet der terranets bw aufgrund geplanter Instandhaltungsmaßnahmen finden Sie unter nachfolgendem Link.
Informationen zu Unterbrechungen an maßgeblichen Ein- und Ausspeisepunkten im Netzgebiet der terranets bw aufgrund geplanter Instandhaltungsmaßnahmen finden Sie unter nachfolgendem Link.
According to Regulation (EC) 715/2009 of the European Parliament and of the Council on access to the natural gas transmission systems and in particular Chapter 2 of Annex 1 as amended on 10 November 2010, European transmission system operators are obliged to publish various regularly updated information in a common data format on their websites.
The following table provides an overview of the implemented transparency requirements and shows where the relevant information can be found on our website. Further publications according to Regulation (EU) 2024/1789 Annex 1 Section 3.3 are available at ENTSOG Transparency platform
Annex I to Regulation (EU)2024/1789 | On our website |
|---|---|
| 3.1.2 a) A detailed description of the offered services and charges | Network access |
| 3.1.2 b) u. c) 1. Various shipping contracts and other significant documents | Network access / Transparency data |
| 3.1.2 c) Network codes / Standard conditions | Network codes / Cooperation Agreement Gas |
| 3.1.2 c) 2. Requirements for gas quality parameters | Significant points |
| 3.1.2 c) 3. Pressure requirements | Network interconnection points Entry / Network interconnection points Exit |
| 3.1.2 c) 4. Procedure for interruption of interruptible capacity | Cooperation Agreement Gas - GTCs and STCs |
| 3.1.2 d) Harmonised procedures applied when using the transmission system incl. definition of key terms | Cooperation Agreement Gas - GTCs and STCs |
| 3.1.2. e) Provisions on procedures for capacity allocation, congestion management, prevention of capacity hoarding and reuse | Prisma primary / Cooperations Agreement Gas - GTCs and STCs |
| 3.1.2 f) Rules for capacity trade on the secondary market towards transmission system operators | Cooperation Agreement Gas - GTCs and STCs |
| 3.1.2 g) Rules for balancing out volume deviations; Calculating balancing energy prices | Trading Hub Europe |
| 3.1.2 h) Flexibility and tolerance values without separate charge as well as with separate charge | Trading Hub Europe |
| 3.1.2 i) Detailed description of the gas network incl. system operators at interrconnection points / Names of adjacent grid operators | Technical desciption |
| 3.1.2 j) Connection rules | Network connection / Transparency information |
| 3.1.2 k) Information on emergency mechanisms | Crisis prevention |
| 3.1.2 l) Procedures agreed for interconnection points and concerning interoperability (if relevant), procedures for nomination and matching, other procedures for allocation and volume deviations including methods applied | Cooperation Agreement Gas - GTCs and STCs |
| 3.1.2 m) Description of methodology and procedure for calculating technical capacity | Procedure for calculating technical entry and exit capacties |
| 3.3.(1) a-e, 3.3.(4), 3.3.(5) Capacities, nominations and renominations, actual load flows, calorific values | |
| 3.3 (1) f) Planned and actual interruptions | Capacity-relevant maintenance measures / |
| 3.3 (1) g) Planned and unplanned interruptions | |
| 3.4 (1) and (2) Information on secundary trade | Cooperation Agreement Gas - GTCs and STCs |
| 3.4 (3) Balancing services | Trading Hub Europe |
| 3.4 (4) Further flexibility services of the transmission system operator; here OFC | Trading Hub Europe |
| 3.4 (5) The gas volume in the network and forecast | Trading Hub Europe |
| 3.4 (6) User-friendly instruments for calculating tariffs | Charges |
According to Art. 29 of Commission Regulation (EU) 2017/460 of 16 March 2017 establishing a network code on harmonised transmission tariff structures, European transmission system operators are obliged to publish information prior to the annual auction.
The following table provides an overview of the implemented transparency requirements and shows where the relevant information can be found on our website.
| Art. 29 (a) Information on standard capacity products for binding capacity (reserve prices, multiplication factors, seasonal factors, etc.) | Please see price list 2026 and price list 2027 To justify the amount of the multiplication factors, terranets bw GmbH refers to the Decision of the Federal Network Agency BK9-25/612 (MARGIT 2027). |
| Art. 29 (b) Information on standard capacity products for interruptible capacity (Reserve prices and an evaluation of the probability of an interruption) | Please see price list 2026 and price list 2027 In Annex I of its Decision BK9-25/612 (MARGIT 2027), the Federal Network Agency determined the amount of the discount for interruptible capacity to be applied at the interconnection points. The methodology to calculate these discounts is described in section 7 of the decision of MARGIT 2027. The methodology to calculate discounts for interruptible capacity of storage points is specified in the decision of the BNetzA BK9-18/608 (Decision ‘BEATE 2.0’, chapter 3.2). The probability of interruption Pro according to decision BK9-18/608 (Decision ‘BEATE 2.0’) is derived from the data of the last three gas business years of the respective entry and exit point according to the following formula:
(K)u describes the maximum interrupted interruptible capacity on day t, (K)v describes the interruptible capacity marketed on day t and S the safety margin, which represents the forecast uncertainty. The probability of interruption is rounded up to full percentage. The applicable discount corresponds to the probability of interruption and is independent of the product duration. According to decision BK9-24/608 (‘BEATE 2.1’), the safety margin of S=10% is again valid for all non-interconnection points, whereas the safety margin at non-interconnection points in the H-gas network was set to S=20% from 01/10/2021 to 31/12/2025. The data to calculate the discount (sales and interruption of interruptible capacity) can be obtained at the ENTSOG transparency platform. There has been no interruption at the points according to BEATE 2.0. For the discount for interruptible capacity in the calendar year 2027 terranets bw GmbH refers to the attachment I of MARGIT 2027. |
According to Art. 30 of Commission Regulation (EU) 2017/460 of 16 March establishing a network code on harmonised transmission tariff structures, European transmission system operators are obliged to publish information prior to the tariff period.
Publication obligations according to Art. 30 Regulation (EU) 2017/460 (NC TAR) (as of: 28.11.2025)
Annex for publication obligations to Art. 30 (Excel-file) (as of: 28.11.2025)
Pursuant to Article 19(1) of Regulation (EU) 2024/1789 of the European Parliament and of the Council of 13 June 2024, European transmission system operators are required to publish information on the determination of allowable revenues or the methods, parameters and values used to determine the target revenues of transmission system operators.
Publication obligations according to Art. 19(1) Regulation (EU) 2024/1789 (NC TAR) (as of: 19.12.2025)
Information on balancing group management, the Virtual Trading Point (VTP), on provision of billing and system energy data as well as on system energy management is available on the Trading Hub Europe GmbH website at www.tradinghub.eu.
NC BAL - Network code for gas balancing in transmission systems
NC CAM - Network code on mechanisms for allocating capacity in transmission systems
NC INT - Network code with stipulations for interoperability and data exchange
NC TAR - Network code on harmonised transmission tariff structures
Current Cooperation Agreements:
Cooperation Agreement XV valid from 01.10.2026
General and Supplementary Terms and Conditions for the Entry and Exit Contract - valid for transmission from 01.10.2026
Non-binding Comparison of Terms and Conditions for the Entry and Exit Contract of 01.01.2026 and 01.10.2026
Past Cooperation Agreements:
Cooperation Agreement XIV.2 valid from 01.01.2026
General and Supplementary Terms and Conditions for the Entry and Exit Contract - valid for transmission from 01.01.2026
Cooperation Agreement XIV valid from 01.10.2024
General and Supplementary Terms and Conditions for the Entry and Exit Contract - valid for transmission from 01.01.2025
General and Supplementary Terms and Conditions for the Entry and Exit Contract - valid for transmission from 01.10.2024
Cooperation Agreement XIII.1 valid from 01.10.2022
General and Supplementary Terms and Conditions for the Entry and Exit Contract - valid for transmission from 01.10.2022
Cooperation Agreement XII valid from 01.10.2021
General and Supplementary Terms and Conditions for the Entry and Exit Contract - valid for transmission from 01.10.2021
Cooperation Agreement XI valid from 01.10.2020
General and Supplementary Terms and Conditions for the Entry and Exit Contract - valid for transmission from 01.10.2020
Cooperation Agreement X-2 valid from 01.01.2020
General and Supplementary Terms and Conditions for the Entry and Exit Contract - valid for transmission from 01.01.2020
Non-binding Comparison of the Terms and Conditions for the Entry and Exit Contract of 30.04.2019 and 31.10.2019
Cooperation Agreement X-1 valid from 01.06.2019
General and Supplementary Conditions for the Entry and Exit Contract - valid for transmission from 01.06.2019
Non-binding Comparison of Terms and Conditions for the Entry and Exit Contract of 31.07.2018 and 30.04.2019
Cooperation Agreement X valid from 01.10.2018
General and Supplementary COnditions for the Entry and Exit Contract - valid from 01.10.2018
Verfahren zur Ermittlung der technischen Ein- und Ausspeisekapazitäten:
Verfahren zur Ermittlung der technischen Ein- und Ausspeisekapazitäten (PDF, 493 KB)
Historische technische Kapazitäten der letzten fünf Jahre:
Technische Kapazität 2020
Technische Kapazität 2021
Technische Kapazität 2022
Technische Kapazität 2023
Technische Kapazität 2024
The results of the calls for tender for load flow commitments (LFC) and of the calls for tender for load flow commitments in the form of shutdown contracts (LiFA) for the years 2013 to 2023 are available below:
2013 - results call for tender LFC
2014 - results call for tender LFC
2015 - results call for tender LFC
2016 - results call for tender LFC
2017 - results call for tender LFC
2018 - results call for tender LFC
2018 - results call for tender - LiFA
2019 - results call for tender LFC
2019 - results call for tender - LiFA
2020 - results call for tender LFC
2020 - results call for tender - LiFA
2021 - results call for tender - LiFA
2021 - results call for tender LFC
2022 - results call for tender - LiFA
2022 - results call for tender LFC
2022 - results call for tender LFC after first return
2022 - results call for tender LFC after second return
2023 - results call for tender - LiFA
2023 - results call for tender LFC
2024 - results call for tender LFC
SDB natural gas, dried (03/2021)
Information Hazardous Incident Ordinance Natural Gas Storage Facility Sandhausen (05/2025)
By mutual agreement, terranets bw provides upstream and downstream grid operators with meter readings taken at common network interconnection points. Data deliveries occur daily (preliminary data) for the respective previous day and monthly (final data) for the respective previous month. Provision of final data occurs by mutual agreement from the 6th working day of a subsequent month (M+6).