Menu

Gas network

We ensure a reliable supply – from Lower Saxony to Lake Constance.
 

Telecommunications network

Our fibre optics network provides a telecommunications infrastructure with strong broadband performance.

The future of energy

We are preparing our networks for the transmission of climate-neutral, green gases and hydrogen.

About us

Learn more about our company.

Vision

Where we want to go and how we would like to develop.

Open positions

Become part of our team – here you will find our open positions!
 

Working at terranets bw

How we work, what we offer and how you can make a difference.
 

Our locations

Discover more about the work at all nine locations.
 

Internships and training

Discover what we offer in way of internships, traineeships and apprenticeships.

Current gas supply situation

As an operator of critical gas supply infrastructure, we would like to inform you about the current situation. 

Hydrogen initiative for BW

We are committed to connecting Baden-Württemberg to the European hydrogen infrastructure.

Emergency no. +49 711 7812 1220

Hazardous Incident Ordinance info. for Sandhaus Gas Storage Facility & Natural Gas Safety Data Sheet

Suche

Publication according to Art. 4 Section 1 REMIT – URGENT MARKET MESSAGE

Here you will find announcemnets of current transparency information according to REMIT (Regulation (EU) No 1227/2011)

02.05.2017 - 07:30

THE MARKET COMMUNICATION HAS A BREAKDOWN

We actually have failures with market communication processes. Especially the auction and booking processes via the PRISMA platform, nomination and allocation processes and publications are not working properly.

terranets bw will immediately inform about alternations of the situation.
We apologize for any inconvenience caused.

02.05.2017 - 09:00

MARKET COMMUNICATION WORKS AGAIN

The market communication is working again.

12.04.2017 - 10:03

REDUCTION OF THE CAPACITY AT POINT RC THAYNGEN-FALLENTOR EXIT

The available freely allocable firm exit capacity at point RC Thayngen-Fallentor Exit will be reduced from 01.10.2017 from 437.551 kWh/h to 227.000 kWh/h due to technical necessary pressure reduction.
Furthermore the available freely allocable firm exit capacity at point RC Thayngen-Fallentor Exit will be reduced from 01.04.2018 from 227.000 kWh/h to 0 kWh/h due to technical necessary pressure reduction.

01.02.2017 - 10:30

AUCTION BOOKINGS AT THE PRISMA PLATFORM TEMPORARILY NOT (ALWAYS) WORKING

Due to technical problems auction bookings via PRISMA European Capacity Platform are currently not or not completely working at the connection points of terranets bw.

Terranets bw will immediately inform about alternations of the situation.
We apologize for any inconvenience caused

01.02.2017 - 12:30

AUCTION BOOKINGS ON THE PRISMA CAPACITY PLATFORM ARE POSSIBLE AGAIN

Auction bookings via the PRISMA European Capacity Platform on connection points of terranets bw are possible again.

21.12.2016 - 17:05

NO MONTHLY AUCTIONS OF INTERRUPTIBLE CAPACITY FOR JANUARY 2017 AT CONNECTION POINTS OF TERRANETS BW AVAILABLE

Due to technical problems there are no monthly auctions for January 2017 for interruptible capacity at connection points of terranets bw at the prisma platform available. All transport customers will get informed about an alternative way to book interruptible capacity for the month of January 2016.


We apologize for any inconvenience caused.

07.12.2016 - 11:00

SCHEDULED MAINTENANCE WORK AT FRONHOFEN

Work on the Fronhofen connection line will take place between 08.05.2017 from 6 am and 20.05.2017 until 6 am. The storage capacity (into storage/Exit) will be reduced by 50%.

We apologize for any inconvenience caused.

07.12.2016 - 11:00

SCHEDULED MAINTENANCE WORK AT FRONHOFEN

Work on the Fronhofen connection line will take place between 04.09.2017 from 6 am and 30.09.2017 until 6 am. The storage capacity (entry and exit) will be reduced by 100%.
We apologize for any inconvenience caused.

28.10.2016 - 12:30

MAINTENANCE WORK AT THE IT-SYSTEMS OF TERRANETS BW

On 2.11.2016 from 12:00 pm to 1:00 pm Maintenance work will be carried out at the IT-systems of terranets bw. Within this period of time the booking of capacity at network points from terranets bw via PRISMA European Capacity Platform will not be possible.

We apologize for any inconvenience caused.

20.09.2016 - 10:00

REDUCTION OF THE AVAILABLE CAPACITY AT THE AT POINT RC THAYNGEN-FALLENTOR AT THE PRISMA CAPACITY PLATFORM

The available capacity at the point RC THAYNGEN-FALLENTOR will be reduced to 0kWh/h in the time from 27.09.2016 6:00 am- 30.09.2016 6:00 am.

RSS REMIT RSS-Feed

Please contact us

We are happy to help you.

Rebecca Penno

Rebecca Penno

Head of Corporate Communications

presse[at]terranets-bw.de
+49 711 7812 1266

Contact now

Cookie-Einstellungen